Lenze L-force I/O System 1000 Uživatelský manuál Strana 22

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 99
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 21
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
22 L 2.0 EN - 11/2010
13. Add more electronic modules.
Use the Select New Module button to put the selected electronic module to the
end.
Use the Insert Module button to insert the selected electronic module in front
of the marked module.
Use the Cut button to remove the marked electronic module.
Use the Paste button to insert the electronic module cut before in front of the
marked module.
Use the Duplicate button to copy the marked electronic module and insert it in
front of it.
Use the Delete button to delete the marked electronic module.
•Use the ÍÎ buttons to move the marked electronic module to the right or left.
14. Press Complete.
Then, an I/O system 1000 may look as follows:
Zobrazit stránku 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 98 99

Komentáře k této Příručce

Žádné komentáře