Lenze PLC Designer PLC Designer (R3-1) Uživatelský manuál Strana 62

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 117
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 61
L-force | PLC Designer
Concepts and Base Components
60 DMS 4.1 EN 03/2011 TD29
PLC Configuration and Task Configuration integrated in devices tree
UNICODE support
Single-line comments
Continuing in loops
Multiple selection in the project object tree
Online help integrated in the user interface
Conditional compilation
Conditional breakpoints
Debugging: step to cursor, back to previous caller
Field bus driver matching IEC 61131-3
Symbolic and PLC configuration available in application
Free memory allocation of code and data
Each object can be specified to be "internal" or "external" (late link in the runtime
system)
Connecting external data sources (Data Server)
Precompile notes concerning syntax errors
Compatibility concerning »PLC Designer« V2.3 projects and other file formats
Projects of different formats, i.a. projects created with »PLC Designer« V2.3, can be
opened if the appropriate converter is installed. See command 'Open Project'. The
handling of included libraries and devices can be defined.
Syntactical and semantical restrictions since »PLC Designer« V2.3:
FUNCTIONBLOCK is no longer a valid key word instead of FUNCTION_BLOCK.
TYPE (declaration of a structure) requires a following “:”
ARRAY initialisation requires squared brackets.
local declaration of an enumeration is no longer possible except within TYPE; at
a V2.3 import a local enumeration declaration will be converted automatically
to an explicit type definition.
INI is no longer supported (replaced by the Init Method)
In function calls, it is no longer possible to mix explicit parameter assignment
with implicit, therefore it is possible to change the order of parameter input
assignments:
fun(formal1 := actual1, actual2); // -> error message
fun(formal2 := actual2, formal1 := actual1); // same semantics as
fun(formal1 := actual1, formal2 := actual2);
Pragmas (»PLC Designer« V2.3 pragmas not yet implemented)
The TRUNC operator now converts to data type DINT instead of INT; at a V2.3
import an appropriate type conversion will be added automatically.
Zobrazit stránku 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 116 117

Komentáře k této Příručce

Žádné komentáře