7 Commissioning of the system
7.3 Detailed description of the commissioning steps
52
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7.3.4.4 Overview of the commissioning steps
The main commissioning steps are listed in the following table:
Step Activity
1. Create a project folder
( 43)
2. Creating a PLC program with a target system (Logic/Motion)
( 71)
3. Configuring the communication parameters
( 73)
4. Determining the physical EtherCAT configuration (fieldbus scan)
( 75)
or
Creating a control configuration (adding field devices)
( 79)
5. Creating a task
( 82)
6. Setting a DC synchronisation
( 87)
7. Checking the wiring
( 54)
8. Entering motor and controller settings
( 54)
9. Setting the feedback system for servo control
( 57)
10. Integrating the L_SMC_AxisBasicControl function block
( 59)
11. Setting SoftMotion parameters
( 92)
Only required for drives with Motion functionality.
12. Processing EtherCAT I/O mapping
( 95)
Only required for drives that solely have the master functionality (logic bus).
13. Compiling the PLC program code
( 103)
14. Logging in on the controller with the »PLC Designer«
( 103)
With the log-in, the fieldbus configuration and the PLC program are loaded into the Controller.
15. Starting the PLC program
( 103)
16. Executing manual control
( 65)
17. Optimising control
( 67)